Nido Petroleum on behalf of SC 63 Joint Venture partners PNOC-EC and Dragon Oil (SC 63 Philippines) Limited wishes to advise that the Baragatan-1A well was successfully spudded on 25 May 2014.
The 30' conductor pipe was run to a depth of 173.3 metres Measured Depth and successfully set across the unstable geological zone. Following the setting of the 30' conductor the well will be drilled to the 13 3/8' casing point around 982 meters Measured Depth (950 meters TVD sub-sea).
Tags:
Nido Petroleum Limited
Comments on this page are closed.