Nextraction Energy Corp. report flow test results from its latest completed horizontal well on its Provost Viking light oil property in eastern Alberta.
The well was drilled with a 665 meter horizontal leg and completed with an 11 stage fracture stimulation. The well was flowed back on cleanup for 130 hours producing a total of 1,243 bbls of oil and 566 bbls of water, for an average rate of 229 bbls/d of oil.
At the end of the initial test period, the well was flowing with a 90% oil cut and 40% of the frac fluid had been recovered.
Tags:
Nextraction Energy
Add a Comment to this Article
Please be civil. Job and promotion will not be added into the comment page.