Scandoil  

Nextraction reports flow test results from provost Horizontal well


Published Sep 10, 2012
[an error occurred while processing this directive]

Edit page New page Hide edit links

Nextraction Energy-3

Nextraction Energy Corp. report flow test results from its latest completed horizontal well on its Provost Viking light oil property in eastern Alberta.

The well was drilled with a 665 meter horizontal leg and completed with an 11 stage fracture stimulation. The well was flowed back on cleanup for 130 hours producing a total of 1,243 bbls of oil and 566 bbls of water, for an average rate of 229 bbls/d of oil.

At the end of the initial test period, the well was flowing with a 90% oil cut and 40% of the frac fluid had been recovered.

Tags: Nextraction Energy




Advertisment:

Add a Comment to this Article

Please be civil. Job and promotion will not be added into the comment page.

(Use Markdown for formatting.)

This question helps prevent spam:

+ Larger Font | + Smaller Font
Top Stories

 

 

 

 


 


RSS

RSS
Newsletter
Newsletter
Mobile News
Mobile news

Computer
Our news on
your website


Facebook
Facebook
Twitter
Twitter

Contact
Contact
Tips
Do you have any
tips to us
Stats

 

sitemap xml