Mohawk Energy, developer of tubular expansion technologies, has announced the release of its 9-5/8-inch MetalPatch system. This system was fully qualified and field tested in the Gulf of Mexico in a deep-water application.
With this latest addition, MetalPatch tools can now cover a full range of 4-1/2-inch to 9-5/8-inch applications from corrosion isolation, well integrity, or sliding sleeves failures. Furthermore, Metal to Metal sealing offers superior high-pressure isolation from hydraulic fracturing operations.
Mohawk Energy developed the MetalPatch system to provide mechanical isolation while maintaining large inner diameters to withstand high burst and collapse pressures. The product can cover areas ranging from 30 to 8,000 feet in length. “The 9-5/8-inch MetalPatch is the next step in our ongoing commitment to developing tools with greater contingency and larger diameters,” says Scott Benzie, co-founder of Mohawk Energy. “We’re thrilled to roll this product out to the market and look forward to its success.”
Tags:
Mohawk Energy
Comments on this page are closed.