Scandoil.com

Mediterranean provides operational update


Published Sep 16, 2008
[an error occurred while processing this directive]

Edit page New page Hide edit links

Mediterranean Oil & Gas acquires JKX Italia

Mediterranean Oil & Gas says Masseria De Palma 1dir exploration well (MP1d) has been spudded on the Lucera gas production concession onshore Southern Italy.

MP1d should reach the target depth of 1872 metres in approximately 25 days. If the well is successful, testing and completion are forecast to take an additional 20 days.

The MP1d well is located in an existing gas production concession where the joint venture partners are currently producing gas from other fields. If the well is a discovery it can be connected to the existing gas plant.

The exploration play is targeting prospective gas resources of 5.5 to 9 Bcf (best to high case, 100% basis) in the prolific Pliocene sand levels of the Bradano Trough.

The exploration targets in the Pliocene Gas sand complex are expected from 1036m to about the target depth.

Vigna Nocelli 1 Work Over ("VN1wo") - Torrente Celone Gas Production Concession, Italy - MOG Operator; MOG 50%

MOG has successfully completed a rigless work over operation on the gas production well Vigna Nocelli 1.

Six new gas sand levels have been opened between 950 and 1,116m depth and a significant increment of pressure has been recorded in the well following the work over operation.

Following the completion of some maintenance works planned along the existing gas production pipeline, the well should resume production in early 2009 from the residual 280 MMcf P1+P2 gas reserves (100% basis) from the Vigna Nocelli 1 well.

The Company has engaged independent reserve engineers, Studio Ingegneria Mineraria (‘SIM’), to assess the gas reserves at Ombrina Mare. SIM’s assessment is expected to be finalised by the end of September 2008.

Proger Engineers have been commissioned to assist in preparation of the field development plan. The Company anticipates being able to lodge the plan for approval and apply for a production concession in November 2008.

Sergio Morandi, the Company’s CEO, said, "The above Masseria de Palma and Vigna Nocelli operations are part of the Company’s on-going gas production and reserves enhancement strategy. The Company is maximising the gas production potential from its existing portfolio of production concessions and the utilisation of the existing production wells, gas production plants and other infrastructure."




   

Add a Comment to this Article

Please be civil. Job and promotion will not be added into the comment page.

(Use Markdown for formatting.)

This question helps prevent spam:

+ Larger Font | + Smaller Font
Top Stories

 

 

 

 


 


RSS

RSS
Newsletter
Newsletter
Mobile News
Mobile news

Computer
Our news on
your website


Facebook
Facebook
Twitter
Twitter

Contact
Contact
Tips
Do you have any
tips to us

 

sitemap xml


 

Home