Matra Petroleum plc, the oil and gas E&P company focused on Central Europe and Russia has plugged and abandoned Pamuk-1 ST. The Pamuk-1 ST was deviated up dip from the original Pamuk-1 vertical hole. The well encountered the top of the mapped structure some 500m away from the original location and similar oil and gas to those in the original well were seen but logging confirmed the sands to be water bearing. The Rotary Rig 42 will now be demobilised shortly.
Peter Hind, Matra's Managing Director said: 'The top of the structure was encountered as expected and there were oil and gas shows. It's probable, however, that the structure has been breached and only residual hydrocarbons remain. The rig is being demobilised and we will review the implications of this well result for the future programme in Inke.'
Matra has a 40% interest in the Inke Concession
Add a Comment to this Article
Please be civil. Job and promotion will not be added into the comment page.