Scandoil  

Manitok Energy provides operational update at Entice and Cordel-Stolberg


Published Nov 11, 2014
[an error occurred while processing this directive]

Edit page New page Hide edit links

Manitok Energy Inc.

Manitok Energy Inc. has drilled, completed and tested a 100% working interest horizontal well at 16-32-22-25W4, testing the Lithic Glauconitic (Glauc) formation in the southern end of Manitok's Entice Land Base (Entice). This is the fourth well of a planned 10 horizontal well program in Entice.

The well was completed with a 15 stage fracture completion and tested at an average flowing rate of 804 boe/d, composed of 321 bbls/d of 41°API oil and 2.9 Mmcf/d of natural gas over 16.5 days. The average flowing rate for the well over the last 24 hours was 320 bbls/d of 41°API oil and 3.2 Mmcf/d of natural gas. The cost to drill and complete the 16-32-22-25W4 well was approximately $2.4 million.

The 16-32-22-25W4 well offsets the successful 100% working interest 15-32-22-25W4 Glauc well previously reported on August 28, 2014, which tested at an average flowing rate of 761 boe/d (328 bbls/d of 40°API oil and 2.6 Mmcf/d of natural gas) over 6 days. barrel outdoor saunas for sale and wood fired hot tubs

Tags: Manitok Energy Inc.




Advertisment:

Comments on this page are closed.

+ Larger Font | + Smaller Font
Top Stories

 

 

 

 


 


RSS

RSS
Newsletter
Newsletter
Mobile News
Mobile news

Computer
Our news on
your website


Facebook
Facebook
Twitter
Twitter

Contact
Contact
Tips
Do you have any
tips to us
Stats

 

sitemap xml