Kulczyk Oil Ventures Inc. says that the Olgovskoye-15 (O-15) well has commenced drilling. The O-15 well is operated by KUB-Gas LLC (KUB-Gas), a partially-owned subsidiary in which KOV has a 70% effective ownership interest.
Olgovskoye-15 Well
The O-15 well, with a planned total measured depth (MD) of 3,200 metres, will be drilled as a directional well to evaluate the potential of the Bashkirian R30c and Serpukhovian S5 reservoir sands to further develop the gas production capability of the Olgovskoye Field. The well is expected to take approximately 70 days to reach its planned MD.
Tags:
Kulczyk Oil Ventures
Add a Comment to this Article
Please be civil. Job and promotion will not be added into the comment page.