Scandoil  

Kulczyk Oil begins drilling at Ukraine well


Published May 30, 2011
[an error occurred while processing this directive]

Edit page New page Hide edit links

Kulczyk Oil Ventures-2

Kulczyk Oil reported that the O-14 well in the Olgovskoye Field commenced drilling.

O-14 Exploration Well The O-14 well is located approximately 4 kilometers to the southeast of the O-8 well. The O-14 well will be drilled to a depth of 2,800 metres and is designed to test gas-bearing reservoirs in the Muscovian and Lower Bashkirian and to further develop the gas production capability of the Olgovskoye Field. The drilling of the O-14 well is expected to take approximately 35 days.

The well, which will target a previously untested fault block identified after interpretation of 2D seismic data by the KOV/KUB-Gas technical team, is on trend with the main Olgovskoye producing area. A successful well in this fault block has the potential to substantially increase the current reserves base of the Company in Ukraine. RPS, the Company's independent engineering consulting firm, has assigned Contingent Resources to the 70% effective interest of KOV of 3.2 billion cubic feet ("Bcf") (Low Estimate), 12.3 Bcf (Best Estimate) and 29.1 Bcf (High Estimate) of natural gas to the untested fault block.

The O-14 well is the third new well drilled in the Olgovskoye field since the Company acquired its interest in KUB-Gas in June 2010. It is part of a larger development programon the KUB-Gas assets through 2011 and 2012.

Tags: Kulczyk Oil Ventures




Advertisment:

Add a Comment to this Article

Please be civil. Job and promotion will not be added into the comment page.

(Use Markdown for formatting.)

This question helps prevent spam:

+ Larger Font | + Smaller Font
Top Stories

 

 

 

 


 


RSS

RSS
Newsletter
Newsletter
Mobile News
Mobile news

Computer
Our news on
your website


Facebook
Facebook
Twitter
Twitter

Contact
Contact
Tips
Do you have any
tips to us

 

sitemap xml