Scandoil  

Kina Petroleum provides progress update on Kwila-1 exploration well


Published Jul 8, 2015
[an error occurred while processing this directive]

Edit page New page Hide edit links

Kina Petroleum

Kina Petroleum Limited is pleased to provide an update on progress of the Kwila-1 exploration well in PPL 337. As at 8.00 a.m. local time on 7 July 2015 the well was at a depth of 1,000 metres and preparing to run wireline logs.

During the week, the well was drilled in a 6.5' hole to a depth of 1,000 metres. The well has intersected both the primary and secondary objectives which comprise thinly interbedded sandstone of good to fair reservoir quality and intercalated siltstone/claystone. The well will now be evaluated by the forthcoming electrical logging program.

Kwila-1 is operated by Heritage Oil Limited under a farmout agreement between Heritage and KPL, whereby Heritage will carry KPL through the drilling and, if appropriate, testing of 2 wells. The first of those wells, Raintree-1, has been drilled. KPL will retain a 30% participating interest in the Licence upon completion of drilling, and in the event of a discovery will benefit from a carry through a seismic program to appraise the field.

Tags: Kina Petroleum Limited




Advertisment:

Comments on this page are closed.

+ Larger Font | + Smaller Font
Top Stories

 

 

 

 


 


RSS

RSS
Newsletter
Newsletter
Mobile News
Mobile news

Computer
Our news on
your website


Facebook
Facebook
Twitter
Twitter

Contact
Contact
Tips
Do you have any
tips to us
Stats

 

sitemap xml