Scandoil  

Key Petroleum faces problem at Dunnart-2 well in Perth Basin


Published Aug 26, 2014
[an error occurred while processing this directive]

Edit page New page Hide edit links

Key Petroleum Ltd.-2

Key Petroleum Limited says that since its last report the hole at Dunnart-2 well in EP437, Perth Basin, Western Australia, was circulated clean and an open hole drill stem test (DST) was conducted over a 42.6 foot (13 meter) section.

The DST tool encountered a mechanical failure so the decision was made to drill to total depth (TD) and log the well. On retrieving the DST tools to the surface the tool was found to contain some good quality Bookara Sandstone that fluoresced under UV light, indicative of live oil.

A mechanical failure means that the test was invalid and was not related to any issues with the reservoir or interval drilled to date. Since retrieving the test tools the well has been drilled to a TD of 2,198 feet (670 meters) rotary table (RT). Further oil shows, including a lower reservoir quality interval above the basement had oil shows and will be evaluated from wireline logs.

Tags: Key Petroleum Ltd.




Advertisment:

Comments on this page are closed.

+ Larger Font | + Smaller Font
Top Stories

 

 

 

 


 


RSS

RSS
Newsletter
Newsletter
Mobile News
Mobile news

Computer
Our news on
your website


Facebook
Facebook
Twitter
Twitter

Contact
Contact
Tips
Do you have any
tips to us
Stats

 

sitemap xml