Scandoil  

Karoon Gas Australia announces Browse Basin gas discovery at Proteus-1


Published Sep 2, 2013
[an error occurred while processing this directive]

Edit page New page Hide edit links

Karoon Gas granted permit extension for WA-314-P and WA-315-P-Spotlight

At 06:00 WST on the 30th of August wireline logging of the Proteus-1ST2 borehole was ongoing.

Since the last update the 4-1/8" hole section was drilled from the 5" liner shoe at 4920 metres below rotary table ("mRT") to a total depth of 5250 mRT. Final Total Depth of 5250 mRT was reached at 12:00 WST on 26th August. Wireline logging operations commenced on the 28th of August 2013 and are ongoing at the time of this release.

The presence of movable hydrocarbons in good quality Jurassic reservoir units is supported by petrophysical log interpretation, formation pressure gradients and gas samples recovered to the surface.

The logging program is near completion and the Joint Venture will be conducting a production test over the coming weeks.

Tags: Karoon Gas Australia Ltd




Advertisment:

Add a Comment to this Article

Please be civil. Job and promotion will not be added into the comment page.

(Use Markdown for formatting.)

This question helps prevent spam:

+ Larger Font | + Smaller Font
Top Stories

 

 

 

 


 


RSS

RSS
Newsletter
Newsletter
Mobile News
Mobile news

Computer
Our news on
your website


Facebook
Facebook
Twitter
Twitter

Contact
Contact
Tips
Do you have any
tips to us
Stats

 

sitemap xml