Scandoil  

Jura Energy completes Sara-4 development well


Published Jan 27, 2016
[an error occurred while processing this directive]

Edit page New page Hide edit links

Jura Energy Corporation

Jura Energy Corporation says that the development well Sara-4, in the Sara Lease, has been successfully completed in the Sui Upper Limestone formation of Eocene age. During a 7 hour post-completion test on a 20/64 inch choke, the well flowed gas at an average rate of approximately 1.6MMcf/d (0.96MMcf/d net to Jura) with an average wellhead flowing pressure of approximately 730 psi.

The development well Sara-4 was drilled to a total depth of 1120 meters.

Sara-4 is located approximately 0.3 km from the existing Sara and Suri gas pipeline infrastructure. Anticipated future production from Sara-4 is expected to be entitled to a gas price of US$2.30 per MMBtu, based on carriage and freight price of crude oil of US$27 per barrel, under the Government of Pakistan's Modified 1994 Petroleum Policy (i.e., the GoP's Policy framework of 2000).

Tags: Jura Energy Corporation




Advertisment:

Comments on this page are closed.

+ Larger Font | + Smaller Font
Top Stories

 

 

 

 


 


RSS

RSS
Newsletter
Newsletter
Mobile News
Mobile news

Computer
Our news on
your website


Facebook
Facebook
Twitter
Twitter

Contact
Contact
Tips
Do you have any
tips to us
Stats

 

sitemap xml