Scandoil  

Jubilant Energy reports successful test results at Kharsang field


Published Oct 31, 2011
[an error occurred while processing this directive]

Edit page New page Hide edit links

Jubilant Energy-2

Jubilant report that KSG#58 (KPL-C), the second of the seven phase III development wells in the Kharsang Field has successfully tested for oil and has been put into production.

The well, which was proposed as a step out development well in the eastern part of the Kharsang Field, was spudded on 22 August 2011. As previously announced, the well was successfully drilled to the target depth of 1,779 metres measured depth (1,602 metres True Vertical Depth) by 27 September 2011 and was tested with the smaller capacity work-over rig.

Based on wireline logging and other data, the consortium identified intervals totalling approximately 50 metres of net sand for testing. The well flowed oil from the interval between 752-758 metres measured depth in Girujan reservoir sand and is currently producing at a rate of around 90-100 bopd.

GeoEnpro Petroleum Ltd., a joint venture of GeoPetrol and Jubilant Enpro (a member of the wider Jubilant Bhartia Group), is the operator of the Kharsang Field. Jubilant holds a 25% interest in the block through its subsidiary, Jubilant Energy (Kharsang) Pvt Ltd. The other members of the consortium are Oil India Ltd and GeoPetrol.

Tags: Jubilant Energy




Advertisment:

Add a Comment to this Article

Please be civil. Job and promotion will not be added into the comment page.

(Use Markdown for formatting.)

This question helps prevent spam:

+ Larger Font | + Smaller Font
Top Stories

 

 

 

 


 


RSS

RSS
Newsletter
Newsletter
Mobile News
Mobile news

Computer
Our news on
your website


Facebook
Facebook
Twitter
Twitter

Contact
Contact
Tips
Do you have any
tips to us

 

sitemap xml