InterOil Corporation has begun flow testing at the Elk-Antelope gas field in Papua New Guinea as part of the field appraisal.
Papua New Guinea Prime Minister the Honorable Peter O'Neill and the Minister for Department of Petroleum and Energy the Honorable Nixon Duban today visited the Antelope-5 well site in the Gulf Province to see the operation and to be briefed on the Elk-Antelope LNG Project, a joint venture of InterOil, Total of France, and Oil Search.
InterOil Chief Executive Dr Michael Hession, Total Managing Director in Papua New Guinea Philippe Blanchard, and Oil Search Managing Director Peter Botten accompanied Prime Minister O'Neill and Minister Duban.
The Antelope-5 flow rate is constrained by reservoir engineers to a maximum test rate of about 70 million standard cubic feet a day.
Tags:
InterOil Corporation
Comments on this page are closed.