Scandoil  

Integrated Vessel Control Systems for two well intervention vessels at FSG in Germany


Published Sep 10, 2014
[an error occurred while processing this directive]

Edit page New page Hide edit links

Kongsberg Maritime - logo

Kongsberg Maritime will deliver Integrated Vessel Control Systems for two new Siem Offshore owned, Helix Energy Solutions Group, Inc. chartered Well Intervention Vessels (WIV) being built at German shipyard Flensburger-Schiffbau-Gesellschaft (FSG). Both vessels are due for delivery in 2016, and will provide well-intervention services offshore Brazil for Petrobras, for an initial period of 4 years with options to extend.

Based on the Salt 307WIV design, the new WIVs (FSG 765 and 766) will have a length of 158 metres, a beam of 31 metres and max. service speed of 17 knots. The vessels are compliant to MODU code and well-Intervention 2 notation, and will provide accommodation for 150 persons.

Tags: Helix Energy Solutions, Kongsberg Maritime




Advertisment:

Comments on this page are closed.

+ Larger Font | + Smaller Font
Top Stories

 

 

 

 


 


RSS

RSS
Newsletter
Newsletter
Mobile News
Mobile news

Computer
Our news on
your website


Facebook
Facebook
Twitter
Twitter

Contact
Contact
Tips
Do you have any
tips to us
Stats

 

sitemap xml