Scandoil  

Hansa Hydrocarbons sanctions Juliet development


Published Jul 3, 2012
[an error occurred while processing this directive]

Edit page New page Hide edit links

Hansa Hydrocarbons

Hansa Hydrocarbons Limited (Hansa), together with its partners GDF SUEZ E&P UK Ltd ('GDF SUEZ') and First Oil Expro Limited ('First Oil'), has sanctioned the Juliet gas field in block 47/14b in the UK Southern North Sea. First gas from Juliet is expected in Q4 2013 with peak production from the field anticipated to be 80mmscfd. The development will comprise two horizontal subsea wells tied back some 22km to the Pickerill A platform operated by Perenco UK Ltd via a 12-inch diameter export pipeline and control umbilical.

The first well is expected to be spudded by Q2 2013 with topsides and subsea construction taking place throughout 2013. Existing infrastructure will transport the Juliet gas from Pickerill A to the ConocoPhillips operated Theddlethorpe terminal on the Lincolnshire coast.

Tags: Hansa Hydrocarbons




Advertisment:

Add a Comment to this Article

Please be civil. Job and promotion will not be added into the comment page.

(Use Markdown for formatting.)

This question helps prevent spam:

+ Larger Font | + Smaller Font
Top Stories

 

 

 

 


 


RSS

RSS
Newsletter
Newsletter
Mobile News
Mobile news

Computer
Our news on
your website


Facebook
Facebook
Twitter
Twitter

Contact
Contact
Tips
Do you have any
tips to us
Stats

 

sitemap xml