Greene’s Energy Group, LLC (GEG) has announced an open house event for the completion of its pipeline training and test loop operations at its Houston Pipeline Services facility on Thursday, February 13, 2014, immediately following the close of the Pipeline Pigging & Integrity Management Conference, said Tom Sawyer, GEG’s vice president.
The facility is located at 2705 Frick Road, Houston, TX 77038, and is available for third party operator training, equipment and procedure testing, industry research and development projects. Classroom facilities are also available for use in conjunction with the test loop.
The test loop includes 1,100’ (335 m) of 6” (152 mm) standard wall piping and 1345 psi (100 bar) working pressure with 2017 psi (138 bar) test pressure. Other highlights include 3D bend radius, 120’ (37 m) underground, two replaceable 10’ (3 m) spools for deflect detection, vertical/horizontal launch/receive capabilities and various features for equipment and instrumentation hookup.
Tags:
Greene’s Energy Group
Comments on this page are closed.