GE Oil & Gas has received an order for the offshore oil and gas industry’s first 20,000-psi (20-ksi) rated deepwater blowout preventer (BOP) stack and riser systems from Copenhagen, Denmark-based Maersk Drilling. The equipment, due to enter service in the first half of 2018, is being supplied for Maersk and BP as part of their joint Project 20K™ Rigs design program.
BP and Maersk Drilling announced their joint study agreement in February 2013 to develop conceptual engineering designs for a new generation of advanced drilling rigs that will be critical to unlocking the next frontier of deepwater oil and gas resources. Called 20K Rigs, the BP-Maersk Drilling agreement will result in deepwater drilling vessels designed to efficiently operate in high-pressure and high-temperature reservoirs up to 20,000 psi and 350 degrees Fahrenheit.
Tags:
GE Oil & Gas
Comments on this page are closed.