Scandoil  

Gas2Grid continues the Malolos-1 well operations


Published Jul 31, 2014
[an error occurred while processing this directive]

Edit page New page Hide edit links

Gas2Grid Limited

Gas2Grid Limited advises that Malolos-1 well operations are continuing with a daily cycle of wellhead pressure buildup followed by gas flaring and wellhead pressure reduction which has been associated with some oil production.

As previously advised Malolos-1 swabbing operations were suspended on the 17th June after sufficient production data had been gathered to support an application to the Philippine Department of Energy, to continue operations within SC 44 to establish the best completion technology and fully appraise the oil field.

Over the past few weeks the Malolos-1 well has been shut-in overnight resulting in the wellhead pressure building up to between 100-220 psi. The pressure build-up is associated with an increase in oil and natural gas in the tubing. The gas is flared daily to lower the wellhead pressure to zero and then shut-in again overnight. The gas is being sourced from solution within the oil, which has now flowed to surface under natural pressure.

Tags: Gas2Grid Limited




Advertisment:

Comments on this page are closed.

+ Larger Font | + Smaller Font
Top Stories

 

 

 

 


 


RSS

RSS
Newsletter
Newsletter
Mobile News
Mobile news

Computer
Our news on
your website


Facebook
Facebook
Twitter
Twitter

Contact
Contact
Tips
Do you have any
tips to us
Stats

 

sitemap xml