|
Field Developments
Swala Energy completes 2D seismic programme over Kilombero BasinJan 7, 2015Swala Energy Limited says that its 58.5% owned subsidiary company, Swala Oil and Gas (Tanzania) Plc, has successfully
Tourmaline Oil on track to meet or exceed 2015 average production guidanceJan 7, 2015Tourmaline Oil Corp. provides an update on year end 2014. The Company achieved a 2014 production exit of 151,000 boepd and remains on track
Pan Pacific and NZOG estimate reserves increase at Pateke-4H wellJan 7, 2015Pan Pacific Petroleum and New Zealand Oil and Gas have completed a review of the increase in Tui reserves attributable to
SacOil commences development operations at Lagia oil fieldJan 7, 2015SacOil Holdings Limited, through its subsidiary Mena International Petroleum Company Limited (Mena), has commenced field
Petrobras completes drilling at Pudim well in Espirito Santo BasinJan 7, 2015Petrobras has completed drilling extension well 3-BRSA-1253D-ESS / 3-ESS-219D (Petrobras nomenclature), informally known as Pudim, at a water depth of 6,187 feet (1,886 meters), in the Espirito Santo Basin post-salt offshore Brazil. The completion of this well, which had been announced to the market on Oct. 7, confirmed the presence of excellent quality oil
Shaikan gross production reached 40 mboepd levelJan 6, 2015Gulf Keystone Petroleum Limited provides an update on the Company's operations at Shaikan, its key producing asset.
AWE Limited receives government approval for Lengo gas projectJan 6, 2015AWE Limited has been advised by the Operator of the Bulu production sharing contract (PSC), KrisEnergy, that the
Osage Exploration announces 850 BOED Mississippian wellJan 6, 2015Osage Exploration and Development, Inc. announced a one-day peak rate on the Everest 1-9MH and 30-day production rates
Gulfport Energy Corporation provides 2014 exit rateJan 6, 2015Gulfport Energy Corporation announces the Company's 2014 exit rate and provides an operational update.
ConocoPhillips reports first oil production from the Eldfisk II projectJan 6, 2015ConocoPhillips announced first oil production from the Eldfisk II project in the Norwegian North Sea.
Eni starts production at Nené Marine Field, offshore CongoJan 6, 2015Eni has started production from Nené Marine field, offshore Congo, just eight months after obtaining the production permit and
Cooper Energy spuds Indonesian oil development wellJan 5, 2015Cooper Energy Ltd. has drilled Bunian-3 well in the Sukananti KSO, South Sumatra, Indonesia at 5:00 pm Indonesian local
Tamarack Valley Energy announces a record 2014 exit production rate of 9,700 boe/dJan 5, 2015Tamarack Valley Energy Ltd. announce that a successful second half 2014 drilling program in the Wilson Creek area contributed
Statoil and partners brings Valemon gas and condensate field on streamJan 5, 2015The Valemon gas and condensate field in the North Sea was brought on stream by Statoil and partners. Recoverable reserves from the field are estimated at 192 million barrels of oil equivalent. “Valemon is one of several new projects on the Norwegian continental shelf that will help add value, activity and innovation,
BNK completes reservoir model analysis for the Gapowo B-1H shale gas wellJan 2, 2015The previously announced reservoir model analysis for the Gapowo B-1H shale gas well in Poland has been completed.
Rose Petroleum completes status up-date on State 16-42 Paradox wellJan 1, 2015Rose Petroleum says that following on from the commencement of operations announcement on 17 December 2014, its wholly
BNK Petroleum reports increasing success on the Tishomingo fieldJan 1, 2015BNK Petroleum Inc. has fracture stimulated 30 percent of the Emery 17-1H well (98.7% interest). The Company has decided to flowback the well at this time and
Rose Petroleum spuds State 1-34 Mancos wellJan 1, 2015Rose Petroleum’s wholly owned subsidiary, Rose Petroleum (Utah) LLC, has spudded the State 1-34 Mancos Well located in
KrisEnergy receives green light for Indonesia gas projectDec 31, 2014KrisEnergy Ltd. says that the Government of Indonesia has approved the plan of development (POD) for the Lengo gas field in the Bulu production
Range Resources updates Trinidad operationsDec 31, 2014Range is making significant progress on the proposed waterflood programmes in Trinidad with its strategic partner LandOcean Energy Services Co, Ltd (LandOcean).
Jupiter Energy drilling update for Well 19Dec 31, 2014The Board of Jupiter Energy Limited provides the following drilling update. Well 19 was spud on Friday 26 December 2015. The well is being drilled on the East Akkar field
BP reports first oil from Kinnoull field in central North SeaDec 31, 2014BP, on behalf of the Kinnoull field co-venturers, has started production from the Kinnoull field in the central North Sea. Kinnoull is BP’s seventh and final
BG Group and Petrobras submit declaration of commerciality for the Iara AreaDec 31, 2014BG Group says that its partner Petróleo Brasileiro S.A. (Petrobras), as the operator of block BM-S-11 in the pre-salt Santos Basin, has submitted the
Lundin completes the Lindarormen exploration well, offshore NorwayDec 31, 2014Lundin Petroleum, through its wholly owned subsidiary Lundin Norway, has completed the drilling of wildcat well 6405/12-1 on PL584. The well
|