Unmanned wellhead platform chosen concept for Oseberg future developmentFeb 10, 2015Statoil and its licence partners have chosen an unmanned wellhead platform as the concept for the Oseberg Future development
Egdon Resources make positive update on Wressle-1 wellFeb 10, 2015Egdon Resources plc provides an update on the ongoing well test operations at the Wressle-1 oil discovery in licence PEDL180
Central Petroleum to begin selling gas from its Palm Valley gas fieldFeb 10, 2015Central Petroleum Limited announced agreement with Power and Water Corp (PWC) for the early sale of gas under a Gas Sale and
Buru Energy finds no significant hydrocarbons at Sunbeam 1 wellFeb 10, 2015Buru Energy provided the following update on drilling operations at the Sunbeam 1 well in EP 129 in Western Australia as at 06:00
UtStord 3D seismic survey covers the new Zulu discovery, NorwayFeb 10, 2015Searcher’s UtStord 3D seismic survey includes coverage to the new Zulu gas discovery by Lundin, which is close to the giant Johan
Statoil reports exploration success in the Krafla areaFeb 10, 2015Operator Statoil has together with PL035 partners completed a two-well programme in the Krafla area in the North Sea. Since 2011 significant new recoverable resources have been proven in the area. The Krafla Main Tarbert appraisal well and the small oil discovery in the Krafla North prospect in December has increased the
Gulf Keystone recommences oil supply for local Kurdistan useFeb 9, 2015Gulf Keystone Petroleum provides an update on the Company's operations at Shaikan, its key producing asset.
Sterling Resources decide to plug and abandon Crosgan appraisal wellFeb 9, 2015Sterling Resources Ltd. provides an update on the Crosgan appraisal well 42/15b-3 in the UK Southern North Sea. The well
Noreco produced 4 353 boe per day in January 2015Feb 9, 2015Huntington production in January has been stable but restricted to approximately 1 500 bopd net to Noreco. While the CATS
Spectrum commences new offshore 2D multi-client seismic projectFeb 9, 2015Spectrum has commenced a 12,000 km Multi-Client 2D seismic survey offshore the Pelotas Basin of Brazil.
Petrolia Norway plugs and abandons Zulu exploration well as gas discoveryFeb 9, 2015Petrolia Norway AS, a 100% subsidiary of Petrolia SE, has completed drilling of wildcat well 26/10-1. The well investigated the
EQT Corporation proved reserves increase 29%Feb 6, 2015EQT Corporation reported year-end 2014 total proved reserves of 10.7 Tcfe. This represents a 2.4 Tcfe net increase over 2013, with
Petro One Energy report their first horizontal well is on productionFeb 6, 2015Petro One Energy Corp. reports that Well 6-22, its first horizontal well drilled in the upper Viking, was completed as planned and has
Archer Petroleum to participate in horizontal well in Runnels County, TexasFeb 6, 2015Archer Petroleum Corp. has signed a participation agreement to participate in the drilling of the Clayton No. 1H, a horizontal well.
INPEX commences oil production from Nasr oil field Offshore Abu DhabiFeb 6, 2015Inpex Corporation , through its wholly-owned subsidiary, Japan Oil Development Co., Ltd. (JODCO), has commenced oil production from the Nasr Oil Field offshore Abu Dhabi, the United Arab Emirates, on January 24, 2015.The Nasr Oil Field is located approximately 130km northwest of Abu Dhabi City. INPEX has jointly developed the Nasr Oil Field with
Mosman to commence flow testing following positive technical report resultsFeb 5, 2015The Directors of Mosman Oil and Gas Limited update shareholders in respect to operational activity as follows: The Company has now received the latest technical
Vital Energy prepares two horizontal wells for production, applies for two moreFeb 5, 2015Vital Energy Inc. announces the following status update: Pennant Area, S.W. Saskatchewan: The previously announced 2 horizontal well locations at
LGX Oil + Gas announces results of successful 2014 drilling programFeb 5, 2015LGX Oil + Gas Inc. provides completion results from late 2014 southern Alberta drilling activity. LGX drilled two horizontal wells into
Nostra Terra record 102% increase in production in the fourth quarterFeb 5, 2015Nostra Terra is pleased to provide an operational and production update for the fourth quarter of 2014. December net production averaged 169 boepd (net of royalties),
Beach Energy shuts in Geoffrey-1 well in ATP 855Feb 5, 2015Icon Energy Limited provided an update on the Stimulation and Flow testing program in ATP 855 in the Cooper-Eromanga Basin in
TransAtlantic Petroleum announces preliminary 2015 capital expenditure budgetFeb 5, 2015TransAtlantic Petroleum Ltd. announced a corporate update, a preliminary 2015 capital expenditure budget and an update on its operations.
INPEX begins development drilling for Ichthys LNG projectFeb 5, 2015Inpex Corporation (INPEX) says that the INPEX-operated Ichthys LNG project commenced drilling at the Ichthys gas-condensate field, about 200km off the Western Australian coast.The first development well was spudded on February 3 by the Project’s development drilling rig ENSCO-5006, which recently arrived
Rose Petroleum reports successful Mancos drilling programmeFeb 4, 2015Rose Petroleum is pleased to provide an operational update on the current activities taking place within both its oil and gas and mining divisions.
Petrobras discovers oil at third extension well in Sergipe BasinFeb 4, 2015Petrobras has confirmed the extension of the light oil and gas discovery, as announced to the market Aug. 9, 2013, by drilling