Scandoil  

Exillon Energy provides drilling update


Published Sep 16, 2011
[an error occurred while processing this directive]

Edit page New page Hide edit links

Exillon Energy

Exillon Energy report that well EWS I - 44 successfully found oil on the south-eastern part of the East EWS I field.

EWS I - 44

EWS I - 44 well which was spudded on 1 August 2011 was drilled on a south-eastern part of the East EWS I field from well pad 32.

The well flowed water-free oil naturally to the surface with a flow rate of 768 bbl/day on a 10 mm choke. The well encountered the Jurassic P reservoir at 1,834 meters, confirming 7.3 meters of effective net oil pay within the Jurassic and 3.1 meters of oil-water transition zone. These results support the existing geological model of the Group. The completion and cementation of the well were conducted under revised procedures adopted by the Group subsequent to the well completion issues described in the interim results announced on 26 August 2011.

The well was drilled directionally 1.3 km to the west from the existing well pad. On completion of testing the well will be connected up to existing production facilities.

Tags: Exillon Energy




Advertisment:

Add a Comment to this Article

Please be civil. Job and promotion will not be added into the comment page.

(Use Markdown for formatting.)

This question helps prevent spam:

+ Larger Font | + Smaller Font
Top Stories

 

 

 

 


 


RSS

RSS
Newsletter
Newsletter
Mobile News
Mobile news

Computer
Our news on
your website


Facebook
Facebook
Twitter
Twitter

Contact
Contact
Tips
Do you have any
tips to us

 

sitemap xml