Scandoil.com

Empyrean advises on TCEI's Sugarloaf project onshore Texas


Published Oct 7, 2009
[an error occurred while processing this directive]

Edit page New page Hide edit links

Empyrean Energy - Sugarloaf project

Empyrean has been advised by Texas Crude Energy Inc (TCEI), the operator of Block B on the Sugarloaf Project that is part of the Sugarkane Gas & Condensate Field ("Sugarkane") in onshore Texas, USA, that planning and initial preparatory work has commenced on the stimulation and completion program for the three existing horizontal wells within Block B. This work forms the first stage of the workscope required to be funded by Hilcorp Energy (Hilcorp) to earn its interests as per the recently announced farmin deal.

The wells will be stimulated using a fracture design that is based upon recent operations within the Eagle Ford Shale trend as well as taking account of the specific nature of the Sugarkane field. TCEI has advised that the major part of the work program is likely to start in November 2009, subject to the availability of rigs and equipment. In preparation for the fracture stimulation operations shallow water wells will be drilled and holding pits will be dug at each well location. This work has commenced at the Weston-1H well.

Prior to this a rig will be mobilised to the Kowalik-1H well location to attempt to pull the slotted liner which was originally deployed in the horizontal open hole of this well. If successful the rig will then run and cement a conventional liner and the well will be fracture stimulated in similar fashion to that planned for the other two horizontal wells. If the slotted liner is unable to be recovered, it is likely that an acid stimulation will be attempted on the well. This alternative treatment has been successfully applied locally within the Austin Chalk.

In addition, planning has commenced for a 2010 drilling program as part of the recently announced farmin deal, with the first wells drilled in this program likely to be within Block B. Under the terms of the farmout agreement all 3 new horizontal wells must have started by mid-2011 for Hilcorp to qualify for its full interest in Sugarloaf.

Tags: Empyrean Energy




   

Add a Comment to this Article

Please be civil. Job and promotion will not be added into the comment page.

(Use Markdown for formatting.)

This question helps prevent spam:

+ Larger Font | + Smaller Font
Top Stories

 

 

 

 


 


RSS

RSS
Newsletter
Newsletter
Mobile News
Mobile news

Computer
Our news on
your website


Facebook
Facebook
Twitter
Twitter

Contact
Contact
Tips
Do you have any
tips to us

 

sitemap xml


 

Home