Ezra Holdings Limited says that its subsea services division, EMAS AMC, has finalized a contract with BHP Billiton for the Angostura phase 3 development offshore Trinidad and Tobago in the eastern Trinidadian sector of the Venezuela basin.
The total scope of work includes the project management, fabrication, construction and installation of 12-inch flowline along with a complete subsea package comprised of control umbilicals and detailed engineering, construction and installation of the pipeline end manifold (PLEM) and inline sled (ILS) for the Angostura phase 3 field development located approximately 35 km northeast of Trinidad and Tobago.
Tags:
EMAS AMC
Comments on this page are closed.