Scandoil.com

Elixir Petroleum provides Pompano project update


Published Jan 14, 2008
[an error occurred while processing this directive]

Edit page New page Hide edit links

Elixir Petroleum provides operations update

Elixir Petroleum Limited provides an update on activities at the Pompano Project.

The operator of the Pompano Project, AnaTexas Offshore Inc. (“AnaTexas”) has advised that the Hercules 152 jack-up drilling rig commenced mobilisation to the Pompano field on 9 January 2007. Subject to weather, it is expected the drilling unit will arrive in field over the weekend, with preparation to spud Well SL 103229 #1 (“Well #1”) commencing immediately.

Well #1 is designed to test seven potentially gas bearing sands located between 3,800 feet and 7,900 feet measured depth. Several of these sands have been productive down dip of the Well #1 location, or nearby within the Pompano field.

The Pompano gas field lies offshore in the Gulf of Mexico, in Brazos Block 446-L SE/4, which is approximately 90 miles southwest of Houston Texas. The field is approximately 7 miles offshore in 55 feet of water.

The Pompano gas field was discovered in 1966 and has produced over 120 billion cubic feet of gas prior to being shut-in in 2003. The Pompano Project is essentially a re-development of the Pompano gas field with new well locations based on modern 3D seismic data.

Tags: Elixir Petroleum Limited




   

Add a Comment to this Article

Please be civil. Job and promotion will not be added into the comment page.

(Use Markdown for formatting.)

This question helps prevent spam:

+ Larger Font | + Smaller Font
Top Stories

 

 

 

 


 


RSS

RSS
Newsletter
Newsletter
Mobile News
Mobile news

Computer
Our news on
your website


Facebook
Facebook
Twitter
Twitter

Contact
Contact
Tips
Do you have any
tips to us

 

sitemap xml


 

Home