Scandoil  

Drillsearch Energy announces May 2014 drilling report


Published Jun 2, 2014
[an error occurred while processing this directive]

Edit page New page Hide edit links

Drillsearch Energy-3

In PEL 91 (Drillsearch 60%, Beach 40% and Operator) Pennington North-1, a vertical near-field exploration well located approximately 900 metres to the north of Pennington-1, spudded on Monday, 12 May 2014. The well encountered trace shows in the McKinlay/Namur reservoir but no pay was interpreted over the interval.

Good shows were however observed in the lower Birkhead Formation over a fairly well developed net-to-gross section. A Drill Stem Test (DST) was conducted from 1,718 metres to 1,722.5 metres (Measured Depth) and recovered 22 barrels of oil during a 4 hour flowing period, equating to an approximate flow rate of 120 barrels of oil per day. Based on the DST result and the potential for lateral continuity of oil filled lower Birkhead reservoir sands towards Pennington-1, the well was cased and suspended as a new Birkhead oil discovery.

Tags: Drillsearch Energy




Advertisment:

Comments on this page are closed.

+ Larger Font | + Smaller Font
Top Stories

 

 

 

 


 


RSS

RSS
Newsletter
Newsletter
Mobile News
Mobile news

Computer
Our news on
your website


Facebook
Facebook
Twitter
Twitter

Contact
Contact
Tips
Do you have any
tips to us
Stats

 

sitemap xml