Scandoil  

Dragon Oil completes two sidetracks from the Dzheitune (Lam) 4 platform


Published Jun 26, 2014
[an error occurred while processing this directive]

Edit page New page Hide edit links

Dragon Oil

In the second quarter of 2014, Dragon Oil completed two sidetracks and is currently completing two development wells, the results of which will be reported in the quarterly drilling update at the beginning of July.

The sidetrack drilled from the Dzheitune (Lam) 4 platform to appraise the location for the Dzheitune (Lam) H platform encountered water and will be side-tracked in the future.

The Company anticipate that recoverable reserves attributed to this area to be downgraded; however, we expect that this will be balanced by addition of reserves from drilling results we are seeing in the A-sands, jet pump application and water injection pilot project.

Tags: Dragon Oil Plc




Advertisment:

Comments on this page are closed.

+ Larger Font | + Smaller Font
Top Stories

 

 

 

 


 


RSS

RSS
Newsletter
Newsletter
Mobile News
Mobile news

Computer
Our news on
your website


Facebook
Facebook
Twitter
Twitter

Contact
Contact
Tips
Do you have any
tips to us
Stats

 

sitemap xml