Scandoil  

DNV GL JIP to provide guidance for installation of rigid and flexible pipes, umbilicals and power cables


Published Apr 4, 2014
[an error occurred while processing this directive]

Edit page New page Hide edit links

Elisabeth Gjoerlmesli

Failures of installed pipes, umbilicals and cables during installation can potentially lead to higher costs for the oil & gas industry and delayed start-ups. However, there are currently no Standards or Recommended Practices that address analysis methodology related to the laying of such products.

To address this, DNV GL has launched a Joint Industry Project (JIP) to develop best practice guidelines on this matter. Twenty industry partners have signed up for the JIP, including Statoil, Petrobras and Woodside, as well as all the major installation contractors.

The overall purpose of the JIP is to present the typical challenges that should be addressed in planning and design of marine operations and to establish a common basis for installation design of pipelines, umbilicals and cables:

Tags: DNV GL Oil & Gas




Advertisment:

Comments on this page are closed.

+ Larger Font | + Smaller Font
Top Stories

 

 

 

 


 


RSS

RSS
Newsletter
Newsletter
Mobile News
Mobile news

Computer
Our news on
your website


Facebook
Facebook
Twitter
Twitter

Contact
Contact
Tips
Do you have any
tips to us
Stats

 

sitemap xml