Scandoil  

Dana makes discovery at Nefertiti, Gulf of Suez, Egypt


Published Dec 6, 2010
[an error occurred while processing this directive]

Edit page New page Hide edit links

Dana Petroleum in Egypt

Dana Petroleum report a successful exploration well at the Nefertiti prospect in the South October production sharing contract area (Dana 65% and operator, Inpex 35%), Gulf of Suez, Egypt. The highly deviated well was drilled from an onshore location to an offshore target between 12th July and 14th November 2010.

The Nefertiti-1X well was drilled to a measured depth of 14,150 ft, targeting a prospect in the Asl sands. The well encountered 65ft TVD oil bearing sands. As expected the reservoir was moderately pressure depleted and the flow test was completed using an Electrical Submersible Pump (ESP).

During the drill stem test, the well flowed at a maximum stabilized rate of 1,544 barrels of fluid per day with a BS&W of 13% and a Gas Oil Ratio of 279 scf/bbl. The maximum flow rate was constrained by the size of the ESP. The ESP has been left in the well and the well suspended for future use as a producer. Commerciality and possible development plans will be discussed with EGPC.

Dana expects to secure 3.9-6.5 million barrels of resources from the well.

Tags: Dana Petroleum




Advertisment:

Add a Comment to this Article

Please be civil. Job and promotion will not be added into the comment page.

(Use Markdown for formatting.)

This question helps prevent spam:

+ Larger Font | + Smaller Font
Top Stories

 

 

 

 


 


RSS

RSS
Newsletter
Newsletter
Mobile News
Mobile news

Computer
Our news on
your website


Facebook
Facebook
Twitter
Twitter

Contact
Contact
Tips
Do you have any
tips to us

 

sitemap xml