Scandoil.com

Cue updates on drilling operations at Manaia-1 appraisal


Published Aug 31, 2009
[an error occurred while processing this directive]

Edit page New page Hide edit links

Cue Energy-2

Cue advised that since the last report the Manaia appraisal well has drilled to a depth of 4633m in 12-1/4" hole. The bottom hole assembly failed at this depth and has been pulled out of the hole and replaced. As of August 28, 2009, the drillpipe is being run back into the hole in preparation to continue drilling ahead in 12-1/4" hole.

The Manaia field is located approximately 10km SW of the Maari Field in Exploration Permit PEP 38413 in the offshore Taranaki Basin New Zealand. The field was discovered in 1970 by the Maui-4 well.

The well intersected an oil accumulation in the Mangahewa Formation reservoir which tested at 575 BOPD.

The Manaia-1 appriaisal well is being drilled as an extended reach well from the Maari WHP using the Ensco 107 jackup rig. It is scheduled to take about 45 days to drill and is expected to confirm the presence of the oil column established by the Maui-4 exploration well. If hydrocarbons are established the well will be completed and tied into the Maari facilities for subsequent testing and production.

Participants in the Manaia-1 appraisal well:

Cue Taranaki Pty Ltd 5% OMV NZ Ltd (Operator) 69% Todd Maari Limited 16% Horizon Oil International Limited 10%

Tags: Cue Energy




   

Add a Comment to this Article

Please be civil. Job and promotion will not be added into the comment page.

(Use Markdown for formatting.)

This question helps prevent spam:

+ Larger Font | + Smaller Font
Top Stories

 

 

 

 


 


RSS

RSS
Newsletter
Newsletter
Mobile News
Mobile news

Computer
Our news on
your website


Facebook
Facebook
Twitter
Twitter

Contact
Contact
Tips
Do you have any
tips to us

 

sitemap xml


 

Home