Cooper Energy Limited has upgraded its net 2C Contingent Resource estimate in the Sole field to 121 petajoules (PJ) following reinterpretation of the results of special core analysis of the reservoir section in the Sole-2 well in VIC/RL3 in the Gippsland Basin, Australia.
The Contingent Resource estimate (refer table below) has been determined by Cooper Energy and was completed Nov. 26.
Contingent Resource Estimate in Kingfish Formation, Sole Field, Offshore Gippsland Basin, Victoria
Tags:
Cooper Energy
Comments on this page are closed.