Scandoil.com

Transglobe Energy Corporation announces Godah #7 results


Published Jul 10, 2007
[an error occurred while processing this directive]

Edit page New page Hide edit links

TransGlobe Energy Corporation announces a successful oil well at Godah #7 in the Republic of Yemen.

Block 32, Yemen (13.81% working interest)

The Godah #7 development well was drilled to a total measured depth of 2,386 meters (approximately 200 meters into Basement) and subsequently plugged back and completed as a producing Qishn S1-A oil well. Godah #7 was drilled at a location approximately 770 meters east of the Godah #6. Godah #7 is currently producing 438 gross barrels of oil per day and 7 barrels per day of water from a 4 meter interval in the Qishn S1-A sand. The production rate is pump constrained. Installation of a higher capacity down-hole electrical submersible pump (ESP), which could double the production, will be considered once the production has stabilized.

The drilling rig has moved to Nuzooh #1 (formerly Tasour SW #1) to drill an exploration well targeting Qishn and Madbi/Naifa prospects south and west of the main Tasour field. Nuzooh #1 is located approximately 2.3 kilometers west of Tasour #23ST which recovered 200 barrels of light oil from the Naifa. Planned testing of the Tasour #23ST Naifa discovery (announced December 28, 2006) has been deferred pending the results of Nuzooh #1. The Nuzooh well is expected to take 40 to 60 days to drill.




   

Add a Comment to this Article

Please be civil. Job and promotion will not be added into the comment page.

(Use Markdown for formatting.)

This question helps prevent spam:

+ Larger Font | + Smaller Font
Top Stories

 

 

 

 


 


RSS

RSS
Newsletter
Newsletter
Mobile News
Mobile news

Computer
Our news on
your website


Facebook
Facebook
Twitter
Twitter

Contact
Contact
Tips
Do you have any
tips to us

 

sitemap xml


 

Home