Goltens has been awarded a contract for the engineering and retrofit installation of OceanSaver ballast water treatment (BWT) systems on-board two of BP Shipping’s gas carriers. The vessels to be retrofitted are the two 138,000 cbm LNG vessels British Innovator and British Merchant.
Goltens will undertake the engineering and prefabrication work in 2017 and then complete the installation services in 2018. “We look forward to working closely with BP and applying our well-proven process to the retrofit of these two gas carriers in the most efficient manner,” says Roy Strand, Chief Operating Officer of Goltens Worldwide.
Goltens has centres of excellence in Oslo, Miami, Dubai, Singapore, Shanghai, Busan and Groningen in the Netherlands, where the Green Technologies division is headquartered. Goltens provides clients with comprehensive support for their BWT retrofit projects, including 3D laser scanning and design engineering, system evaluation and comparisons, total engineering packages; including bill of materials, 3D shipyard installation drawings and instructions and Marine Class Submittals, as well as full turnkey installations.
Tags:
BP Shipping,
Goltens
Comments on this page are closed.