Scandoil.com

Emerald Energy: Khurbet No. 7 top "tougher"


Published Jan 15, 2009
[an error occurred while processing this directive]

Edit page New page Hide edit links

syria

Drilling operations have been completed at the Khurbet East No.7 well in the Khurbet East field, where Emerald Energy has said a well had been delineating the north of the field, establishing the oil-water contact and to exploring the potential for later water disposal.

The well was drilled to a total depth of 2,060 metres and encountered the top of the Cretaceous Massive reservoir at approximately 1,978 metres. Good hydrocarbon shows were encountered across a seven-metre interval while drilling into the reservoir and gradually diminished over the next 13 metres.

The reservoir porosities encountered in the Khurbet East No.7 well were measured mainly in the range of five percent to 10 percent, significantly lower than the exceptional reservoir quality encountered in the central portion of the field where porosities are in the range of 16 percent to 20 percent. Variations in reservoir properties such as these are not unusual in carbonate reservoir systems and this new information, combined with the production history to date, will be important in developing a more refined reservoir model.

Preliminary analysis of the wireline logs is unable to directly establish an oil-water contact due to the generally higher resistivities measured in lower porosity reservoirs. Although the oil-water contact was not directly determined by the wireline logs, preliminary analysis of these logs and the drilling data together indicates that the oil-water contact in the field may be slightly deeper than previously interpreted.

The Khurbet East No.7 well was not production tested and was suspended for further evaluation in the future, which may include production testing, or for later use as a water disposal well.

The acquisition of a 640 square kilometre 3D seismic survey has commenced. This survey is designed to provide contiguous data coverage over a large area surrounding the recent Khurbet East and Yousefieh oil discoveries, complementing the 3D seismic surveys acquired in this area in 2007.

This survey will assist in progressing the new exploration play that has been confirmed by the Yousefieh discovery. The 3D seismic programme is expected to be completed in approximately five months, with final processed data available during the third quarter of this year.

Tags: Emerald Energy Plc




   

Add a Comment to this Article

Please be civil. Job and promotion will not be added into the comment page.

(Use Markdown for formatting.)

This question helps prevent spam:

+ Larger Font | + Smaller Font
Top Stories

 

 

 

 


 


RSS

RSS
Newsletter
Newsletter
Mobile News
Mobile news

Computer
Our news on
your website


Facebook
Facebook
Twitter
Twitter

Contact
Contact
Tips
Do you have any
tips to us

 

sitemap xml


 

Home