Scandoil  

CNOOC begins production from two new oil fields in the Bohai Bay


Published Oct 21, 2010
[an error occurred while processing this directive]

Edit page New page Hide edit links

CNOOC Limited-2

CNOOC Limited says that its two new oil fields, BoZhong ('BZ') 26-3 and LuDa (LD) 32-2 in the Bohai Bay have successfully commenced production.

BZ 26-3 is located in the central part of Bohai Bay, neighboring producing field BZ 25-1S. The field has an average water depth of about 25 meters. The development and production operations of BZ 26-3 mainly rely on the facilities of its surrounding oilfields. With 4 wells online currently, BZ 26-3 is expected to hit its peak production of more than 6,600 barrels per day in 2011.

LD 32-2 is located in the Eastern Bohai Bay with water depth of about 25 meters, and adjacent to producing oil field LD 27-2. In order to reduce production cost, a joint development plan was carried out for both LD32-2 and LD27-2 fields. The field has 4 production wells currently. The peak production of LD 32-2 is expected to reach 6,300 barrels of oil per day in 2011.

BZ 26-3 and LD 32-2 are all independent oil fields of CNOOC Limited. The Company holds 100% interest and acts as the Operator of these two fields.

Tags: CNOOC Limited




Advertisment:

Add a Comment to this Article

Please be civil. Job and promotion will not be added into the comment page.

(Use Markdown for formatting.)

This question helps prevent spam:

+ Larger Font | + Smaller Font
Top Stories

 

 

 

 


 


RSS

RSS
Newsletter
Newsletter
Mobile News
Mobile news

Computer
Our news on
your website


Facebook
Facebook
Twitter
Twitter

Contact
Contact
Tips
Do you have any
tips to us

 

sitemap xml