Central Petroleum Limited has been advised by Santos, as the Operator of EP125 (Northern Territory), that the Ensign 918 rig has mobilised and is anticipated to recommence drilling operations at the Mt Kitty-1 well location in the Amadeus Basin on around 24 March 2014.
As previously advised to the market the top hole of this exploration well was drilled with a shallow capacity rig to a depth of around 785m KB. Planned total depth of the well is around 1,550m subsea (2,030m KB).
Tags:
Central Petroleum Limited
Comments on this page are closed.