Scandoil  

Central Petroleum commences production from Surprise West-1 well


Published Mar 13, 2014
[an error occurred while processing this directive]

Edit page New page Hide edit links

Central Petroleum Limited-2

Central Petroleum Limited advises that the Surprise West-1 well has commenced production. The initial flow rates from Surprise West-1 have exceeded expectation, producing around 675 barrels of oil (flush production, not on pump) in an initial 24 hour period.

This initial 24-hour flush production is very encouraging, flowing at a rate of around 70% higher than the maximum flow rate achieved during the extended production test.

A pump has been installed and following final commissioning later this week will be available to enhance production and oil recovery over the life of the well. Initial storage tanks and related production infrastructure have been installed at site in order to make production available for sale.

Tags: Central Petroleum Limited




Advertisment:

Comments on this page are closed.

+ Larger Font | + Smaller Font
Top Stories

 

 

 

 


 


RSS

RSS
Newsletter
Newsletter
Mobile News
Mobile news

Computer
Our news on
your website


Facebook
Facebook
Twitter
Twitter

Contact
Contact
Tips
Do you have any
tips to us
Stats

 

sitemap xml