Scandoil  

Cathelco supply pipework anti-fouling systems for Lamprell jackups


Published May 14, 2013
[an error occurred while processing this directive]

Edit page New page Hide edit links

LeTourneau Super 116 E new build rig

Cathelco have won a series of orders to supply seawater pipework anti-fouling systems for jack-up rigs which are to be built by Lamprell Energy Ltd, the UAE based provider of diversified engineering services for the offshore oil and gas industry.

The anti-fouling equipment will be supplied for four jackup rigs which are being constructed at the Hamriyah yard for the National Drilling Company (NDC) of Abu Dhabi.

The rigs which will be completely outfitted and equipped by Lamprell are LeTourneau designed, self elevating mobile offshore drillings platforms of the Super 116E (Enhanced) Class Design.

Cathelco pipework anti-fouling systems are designed to eliminate blockages caused by barnacles and mussels in seawater lines. The systems consist of copper and aluminium anodes which are wired to a control panel. In operation, the copper anodes produce ions which create an environment where barnacle and mussel larvae do not settle and grow. At the same time the aluminium anode produces ions which suppress corrosion on the internal surfaces of pipes.

Tags: Cathelco




Advertisment:

Add a Comment to this Article

Please be civil. Job and promotion will not be added into the comment page.

(Use Markdown for formatting.)

This question helps prevent spam:

+ Larger Font | + Smaller Font
Top Stories

 

 

 

 


 


RSS

RSS
Newsletter
Newsletter
Mobile News
Mobile news

Computer
Our news on
your website


Facebook
Facebook
Twitter
Twitter

Contact
Contact
Tips
Do you have any
tips to us
Stats

 

sitemap xml