Scandoil  

Carnarvon to drill a new sidetrack wellbore section of the Phoenix South-1 well


Published Jun 24, 2014
[an error occurred while processing this directive]

Edit page New page Hide edit links

Carnarvon Petroleum Limited-2

Carnarvon Petroleum Limited says that a new sidetrack wellbore section of the Phoenix South-1 well is required to be drilled below the 13 3/8' casing depth, due to the 9 5/8' casing hanger seal assembly running tool (CHSART) ('casing tool'), becoming stuck and preventing forward drilling progress of the current wellbore.

Earlier on 13 June 2014, the Phoenix South-1 well had drilled to 3,706 m depth and was in the process of setting the 9 5/8' diameter casing to support the hole, as per standard industry practice. After setting and cementing the casing in place, the casing tool was unable to be retrieved from the wellhead.

Tags: Carnarvon Petroleum Limited




Advertisment:

Comments on this page are closed.

+ Larger Font | + Smaller Font
Top Stories

 

 

 

 


 


RSS

RSS
Newsletter
Newsletter
Mobile News
Mobile news

Computer
Our news on
your website


Facebook
Facebook
Twitter
Twitter

Contact
Contact
Tips
Do you have any
tips to us
Stats

 

sitemap xml