Candax Energy Inc. reports that its initial work on reopening the Belli-1 well have indicated that the well, in its current configuration, will not be brought back to commercial production.
The test procedures involved a workover to reperforate the reservoir, a swabbing test of the formation and an extended well test using Sucker Rod Pumping (SRP). The SRP production test was halted due to fluid segregation in the casing which prevented the small volume of oil produced to flow through the tubing.
The Belli field is one which has in the past produced in excess of 10,000 bopd. Candax intends to move forward with studies to explore the possibility of further potential.
Tags:
Candax Energy Inc.
Comments on this page are closed.