Byron Energy Limited has set 5 ½ inch intermediate casing to a depth of 7,861 feet (2,396 metres) measured depth ('MD') and 7,751 feet (2,363 metres) true vertical depth ('TVD') in the Byron Energy SM 6 #1 BP02 ('SM 6 #1 BP02'). At 5 pm 17 July 2014 (USA central time) cementing operations have been completed.
The memory log data has been retrieved from the Log While Drilling ('LWD') tool and is a substantial improvement in quality over the real time logs, the results of which were reported in the ASX release dated 16 July 2014.
The LWD memory log data shows that there are several thin hydrocarbon bearing F 30 Sand lobes over a 84 foot (26 metre) gross interval between 7,110 to 7,194 feet (2,167 to 2,193 metres) MD and 7,053 to 7,131 feet (2,150 to 2,174 metres) TVD.
Tags:
Byron Energy Limited
Comments on this page are closed.