Scandoil  

Buru Energy continues drilling at Ungani Far West 1 well


Published Jan 28, 2016
[an error occurred while processing this directive]

Edit page New page Hide edit links

Buru Energy Limited-2

Buru Energy Limited says that since the last progress report, the well has been cored ahead in 3.99 inch (101 millimeter) hole to the current depth at 06:00 hours today of 7,759 feet (2,365 meters).

The top of the Ungani Dolomite was encountered at 7,682 feet (2,341.4 meters) and cores recovered from this point to the current drill depth have displayed well developed vugular porosity with strong mud gas shows and oil bleeding from cores.

The forward plan is to core ahead through the Ungani Dolomite reservoir section.

Tags: Buru Energy




Advertisment:

Comments on this page are closed.

+ Larger Font | + Smaller Font
Top Stories

 

 

 

 


 


RSS

RSS
Newsletter
Newsletter
Mobile News
Mobile news

Computer
Our news on
your website


Facebook
Facebook
Twitter
Twitter

Contact
Contact
Tips
Do you have any
tips to us
Stats

 

sitemap xml