Buru Energy Limited says that since the last progress report, DDH1 Rig 31 has been rigged up and commenced coring operations with a wireline retrievable coring system and the shoe track and rathole cement are being cored.
The current operation is retrieving the bottom hole assembly.
Coring of new formation is expected to take place during the next week.
Tags:
Buru Energy
Comments on this page are closed.