Brinx Resources says that the fourth well at 09-3 Oklahoma project is successful. The drilling, logging, and casing have been completed at this, the fourth and final well of this Project. The result is that all four wells at this location have been a success.
The 09-3 #4 well was drilled to a total depth of 5685 feet and intercepted two hydrocarbon pay zones that total approximately 34 feet. These pay zones of oil and gas are located within Pennsylvania Sands. In addition to the thicker zones, several thinner pay zones were also intercepted by the 09-3 #4 well.
"This is an outstanding way to close out the drilling of the 09-3 Oklahoma Project," said Leroy Halterman, President of Brinx Resources. "It's obviously great news for Brinx and its partners to have been successful at all four wells of the program. In addition, the last well, after production testing, may lead to additional offset locations."
Tags:
Brinx Resources Ltd.
Add a Comment to this Article
Please be civil. Job and promotion will not be added into the comment page.