Scandoil  

BPZ Energy commences development drilling at Corvina Field CX-15 platform


Published Jul 24, 2013
[an error occurred while processing this directive]

Edit page New page Hide edit links

BPZ Energy reports completion of CX11-16X Corvina well-Spotlight

BPZ Energy spuds the first development well at the Corvina field CX-15 platform, located in offshore Block Z-1 in Peru. Drilling and completion of the CX15-1D well is expected to take up to twelve weeks.

Conventional core samples of the Zorritos formation reservoir rocks will be cut during drilling operations and an additional casing string will be used as a precaution to manage any potential shallow gas. Targeted depth of the well will be approximately 7,400 feet subsea. Subsequent wells at the CX-15 platform are expected to be drilled and completed in less time.

In early July, sea and swell conditions caused pre-drilling operations at the CX-15 to be stopped for safety reasons. As a result, operations which were supporting installation of the top drive were suspended, one of the final steps required before drilling could begin.

Tags: BPZ Energy




Advertisment:

Add a Comment to this Article

Please be civil. Job and promotion will not be added into the comment page.

(Use Markdown for formatting.)

This question helps prevent spam:

+ Larger Font | + Smaller Font
Top Stories

 

 

 

 


 


RSS

RSS
Newsletter
Newsletter
Mobile News
Mobile news

Computer
Our news on
your website


Facebook
Facebook
Twitter
Twitter

Contact
Contact
Tips
Do you have any
tips to us
Stats

 

sitemap xml