Scandoil  

BNK Petroleum provides update on Poland and Oklahoma operations


Published Jan 15, 2013
[an error occurred while processing this directive]

Edit page New page Hide edit links

BNK Petroleum-2

BNK Petroleum Inc. provides the following update on its operations in Poland and Oklahoma.

Oklahoma

The exploration horizontal Barnes 6-2H well operated by the Company's US subsidiary BNK Petroleum, (US) Inc. (BNKUS) in its Tishomingo field in Oklahoma, is still being tested with very encouraging results. The 21 day stabilized pumping production rate from the Lower Caney and Upper Sycamore (Mississippian Lime equivalent) formations was 180 barrels of oil equivalent (BOE) per day with 70 percent of the production being oil. As stated in previous press releases, the horizontal section was completed in both the Sycamore and lower members of the Caney formation. The testing results of the individual zones is designed to help optimize placement of laterals in future wells.

To determine which interval is producing the majority of the oil, packers were set in selected sections of the lateral to isolate the various horizons and conduct individual tests. The testing continues, as the individual tests are producing at higher flush rates than expected. For instance the Sycamore interval alone tested 140 barrels of fluid a day with 70% being oil and the balance being frac fluid that is still being recovered. The tests in the select Caney intervals are currently inconclusive because they are flowing clean oil at rates of 200 barrels of oil per day (BOPD).

Tags: BNK Petroleum




Advertisment:

Add a Comment to this Article

Please be civil. Job and promotion will not be added into the comment page.

(Use Markdown for formatting.)

This question helps prevent spam:

+ Larger Font | + Smaller Font
Top Stories

 

 

 

 


 


RSS

RSS
Newsletter
Newsletter
Mobile News
Mobile news

Computer
Our news on
your website


Facebook
Facebook
Twitter
Twitter

Contact
Contact
Tips
Do you have any
tips to us
Stats

 

sitemap xml