Scandoil  

Bengal Energy provides Cuisinier operations update


Published May 5, 2015
[an error occurred while processing this directive]

Edit page New page Hide edit links

Bengal Energy Ltd

Bengal Energy Ltd. and its joint venture parties (JV) have completed the Phase Two drilling campaign on ATP 752 Barta Block (Bengal's working interest 30.357%). Average gross production from the Cuisinier field in March 2015, prior to the tie-in of the new Phase Two wells and the reactivation of the Cuisinier-6 well, was approximately 1,653 barrels of oil per day (bopd) (502 bopd net to Bengal).

The Phase Two drilling campaign exceeded Bengal's technical and commercial expectations. With three of the four cased wells now completed as oil wells, the JV has successfully expanded the pool boundaries and tested the structural flank positions for the presence of oil.

The last well of the Phase Two drilling campaign, Cuisinier-21, tested the northwest flank of the Cuisinier structure. The well encountered oil in the Murta DC70 zone with reservoir pressure at approximately 96% of virgin pressure. The Murta DC70 zone in this well came in structurally below what had been established by other producing wells.

Tags: Bengal Energy




Advertisment:

Comments on this page are closed.

+ Larger Font | + Smaller Font
Top Stories

 

 

 

 


 


RSS

RSS
Newsletter
Newsletter
Mobile News
Mobile news

Computer
Our news on
your website


Facebook
Facebook
Twitter
Twitter

Contact
Contact
Tips
Do you have any
tips to us
Stats

 

sitemap xml