Scandoil  

Beach discoves non-commercial oil at PEL 249's Elliston-2 well


Published Jul 31, 2014
[an error occurred while processing this directive]

Edit page New page Hide edit links

Beach Energy Limited

Cooper Energy Limited says that Elliston-2, located in PPL 249 on the western flank of the Cooper Basin, South Australia, has been plugged and abandoned after reaching a total depth of 5,446 feet (1,660 meters). The well encountered 3.2 feet (1 meter) of oil pay in the primary target Namur Sandstone, which was considered non-commercial to complete as an oil producer.

Cooper Energy Exploration Manager Andrew Thomas said “Elliston-2 penetrated the top of the Namur Sandstone reservoir 6.5 feet (2 meters) deeper than the pre-drill depth prognosis. However, the oil-water-contact in Elliston-2 was encountered at the same depth as in Elliston-1 which has been on production since December 2012. This indicates that Elliston-1 is accessing oil from a different part of the field than previously thought.”

Tags: Cooper Energy




Advertisment:

Comments on this page are closed.

+ Larger Font | + Smaller Font
Top Stories

 

 

 

 


 


RSS

RSS
Newsletter
Newsletter
Mobile News
Mobile news

Computer
Our news on
your website


Facebook
Facebook
Twitter
Twitter

Contact
Contact
Tips
Do you have any
tips to us
Stats

 

sitemap xml