AWE Limited reports that as at 06:00 hours (6.00am NZDT) today, the Pateke-4H development well sidetrack was at a measured depth of 3,845m, directionally drilling ahead with a 12 ¼ inch drilling assembly.
It is planned to drill this section of the well to a measured depth of approximately 4,110m, landing at an angle of approximately 90 degrees, and then install the 9 5/8 inch casing. The well will then be drilled horizontally through the F10 reservoir to a planned measured depth of 5,361m.
Tags:
AWE Limited
Comments on this page are closed.