Scandoil  

AWE's Pateke-4H well to be drilled horizontally


Published Mar 27, 2014
[an error occurred while processing this directive]

Edit page New page Hide edit links

AWE's Pateke-4H development well

AWE Limited reports that as at 06:00 hours (6.00am NZDT) today, the Pateke-4H development well sidetrack was at a measured depth of 3,845m, directionally drilling ahead with a 12 ¼ inch drilling assembly.

It is planned to drill this section of the well to a measured depth of approximately 4,110m, landing at an angle of approximately 90 degrees, and then install the 9 5/8 inch casing. The well will then be drilled horizontally through the F10 reservoir to a planned measured depth of 5,361m.

Tags: AWE Limited




Advertisment:

Comments on this page are closed.

+ Larger Font | + Smaller Font
Top Stories

 

 

 

 


 


RSS

RSS
Newsletter
Newsletter
Mobile News
Mobile news

Computer
Our news on
your website


Facebook
Facebook
Twitter
Twitter

Contact
Contact
Tips
Do you have any
tips to us
Stats

 

sitemap xml