Scandoil  

Antrim resumes production at Causeway Field, UK Northern North Sea


Published Jan 22, 2013
[an error occurred while processing this directive]

Edit page New page Hide edit links

Antrim Energy Inc.

Production has resumed from Antrim's Causeway Field (Antrim 35.5% interest) in the Northern North Sea, following a shut-in period of three days. The nearby Cormorant East Field (Antrim 8.4% interest) is expected to resume production in the next few days.

This announcement is further to the announcement of January 16, 2013 that the export infrastructure system ('Export System') used by Causeway and Cormorant East was unavailable due to a precautionary shutdown of the Cormorant Alpha platform and the Brent Pipeline System. Antrim has now been notified by the Export System Operator, TAQA Bratani Limited, that the flow of crude oil to the Brent Pipeline System has been restored. Cormorant Alpha production (which does not include production from Causeway or Cormorant East) remains shut-in.

Production from both Causeway and Cormorant East is processed at the North Cormorant platform before being exported in a co-mingled stream across the Cormorant Alpha platform to the Brent Pipeline System entry point (located on the Cormorant Alpha platform) for onward transportation to the Sullom Voe terminal and subsequent sale. Approximately 80,000 barrels of oil per day ('bopd') of production from fields upstream of the Cormorant Alpha platform is exported via the Brent Pipeline System.

Tags: Antrim Energy Inc.




Advertisment:

Add a Comment to this Article

Please be civil. Job and promotion will not be added into the comment page.

(Use Markdown for formatting.)

This question helps prevent spam:

+ Larger Font | + Smaller Font
Top Stories

 

 

 

 


 


RSS

RSS
Newsletter
Newsletter
Mobile News
Mobile news

Computer
Our news on
your website


Facebook
Facebook
Twitter
Twitter

Contact
Contact
Tips
Do you have any
tips to us
Stats

 

sitemap xml